If 10 men can complete a piece of work in 30 days how many men are requiredto complete the same job in 25 days?

Respuesta :

AL2006
AL2006 AL2006
  • 22-07-2014
We must assume that all workmen work at the same rate, and keep it up forever.

More men ==> fewer days

so the proportion is:    30/25 = x/10

Cross-multiply the proportion:

300 = 25 x

Divide each side by 25 :

x = 300/25 = 12 men
Answer Link

Otras preguntas

The second angle of a triangular field is three times as large as the first angle. the third angle is 40⁰ greater than the first angle. How long are the angles?
A bike accelerates uniformly from rest to a speed of 7.10 m/s over a distance of 35.4m .determine the acceleration of the bike.
At this rate how many minivans will pass Luann if 60 vehicles passed her?
A bike accelerates uniformly from rest to a speed of 7.10 m/s over a distance of 35.4m .determine the acceleration of the bike.
What part of the body receives the stimulus for vision
How did textile mills affect the lives of workers?
What is the square root of 100
what is 30 less than 4 times a number is equal to 14
What are three fractions equivalent to 1.7
The second angle of a triangular field is three times as large as the first angle. the third angle is 40⁰ greater than the first angle. How long are the angles?