snoopdogsr1397 snoopdogsr1397
  • 23-08-2017
  • Mathematics
contestada

A hole is 12 yards long 7 yards wide and 3 yards deep how many cubic yards of dirt will the company need to remove?

Respuesta :

meloan2211 meloan2211
  • 23-08-2017
Doesn't have dirt... it's a hole...
Answer Link
lexiejames45
lexiejames45 lexiejames45
  • 23-08-2017
First you find the area of the hole by multiplying all three number by each other. Next you convert your total from yards to cubic yards, this means you divide by 9, and now you are done.

(12)(7)(3)=252

252/9=28

28

Hope this helps :-)

Answer Link

Otras preguntas

what are the advantages of kinetic energy?
a trapezoid with a right angle and an area greater than 50
Write a real world situation that could be modeled be the equation 120 + 25x =45x
why is slavery such a big issue during the civil war
I am writing a few paragraphs on my ideal school in Spanish GCSE? I need some inspiration and ideas on my ideal school, it is all about the conditional tense ma
What did the delegates to the Constitutional Convention have in common?
how to write 6/20 in the simplest form
What is the best launch angle for maximum range ?
Which two rivers join at Sutter's point?
Write and solve the inequality three times a number plus five is less than three-fourths of the number. Please help!