Differentiate between the scheduling techniques known as CPM and PERT

Respuesta :

foreverronneshia foreverronneshia
  • 25-03-2022
PERT is for Program Evaluation and Review Technique, whereas CPM stands for Critical Path Method. PERT is used to manage unpredictable activities, whereas CPM is used to manage predictable ones. PERT is concerned with events, whereas CPM is concerned with activities.
Answer Link

Otras preguntas

6. A patient who contributes to causing harm is guilty of _______ negligence.
Which is the best example of an adult using selective optimization with compensation?
What is the denotation of the word float
SELECT ALL CORRECT ANSWERS Which of the following topics would be suitable for a short research paper? 1. An in-depth study of Mary Shelley's Frankenstein 2.
For a given input value nnn, the function ggg outputs a value mmm to satisfy the following equation. 3m-5n=113m−5n=113, m, minus, 5, n, equals, 11 Write a formu
What is the goal of nutrition
The prices of some jewelry sets in a store are shown below: Store Price A $110,000 B $100,000 C $1,110,000 D $130,000 E $120,000 Based on the data, should the m
AB and BA name the same ray
What are the excluded values? 1.)0 and 15 2.)3 and -5 3.)-3 and 5
An empty cylindrical vase with a radius of 8 cm and a height of 9 cm is filled with 6 cm^3 of sand every 15 seconds. At the same time 8cm^3 of sand is taken out