Johnson Construction Company is going to build a house on a concrete slab. The slab is to have dimensions 30 feet by 20 feet by 2 feet. How many cubic feet of concrete should the construction company order

Respuesta :

ursupacool ursupacool
  • 27-05-2021

Answer:

1200ft^3

Step-by-step explanation:

30 x 20 x 2= 1200^3

Answer Link

Otras preguntas

I don’t know why I cant understand this
I need help with this please, I need the answer to Z specifically.
helppp12. What is the rise and the run in the given slope 2 andpoints (-3,-2)?a. rise = 1run= 2b. rise = -1run = 2c. rise = -2run = 1d, rise = 2run = 1​
Two points are g phedo the comdinate plane. 2 -1 -6 -5 -4 -3 -2 1 2 > 4 1 a -1 S 6 7 -2 -3 A А 4 --5 -6 -7 기 -8 9 B -10) What is the distance between the two
5(x+1)-4x arrow pointing right with a line under it -8 solve
Can somebody help me out with this question? I'm not sure if my answer is correct.
pliz pliz pliz pliz ​
Need help plzzzz 20 points
Please help me solve this no sites
Latisha has $ 4.86. Lilliana has $ 1.13. Estimate how much more money Latisha has than Lilliana to the nearest dime (tenth)