alisa9 alisa9
  • 23-09-2016
  • Mathematics
contestada

30men can finish 1/7of a work in 2days.18men will do othe remaining work in ?

Respuesta :

chumxo chumxo
  • 24-09-2016
7/7-1/7=6/7 is the rest of work
1/7 work takes 2days
6*1/7=6/7 work takes 6*2days=12days
30 men takes 12 days to finish the rest of work (6/7)
18 men takes 18*12/30= 7.2days
Answer Link

Otras preguntas

What happens to the power of an electric circuit if the resistance is decreased?
1. Kimberly wants to build a computer model of her local climate. What sort of data should Kimberly collect in order to create her model?
Helen has an unknown quantity of money(m).Ingrid has $50 more than Helen.Write an expression that represents the total amount of money that Helen an ingrid have
In star girls how lived in the house that was full of bones
how bad are biological weapons in comparison to other weapons
In which spiritual concept do most Hindus believe
Read the sentence. The research paper on the Greek Olympics included illustrations by Molly and Jeff. Which best identifies and names the case of the pronoun th
A rectangular floor is 12 feet long and 11 feet wide a rug that is 9 feet long and 7 feet wide covers part of the floor how many square feet of the floor are no
Which elements will bond ionically with barium such that the formula would be written as bax2? a.nitrogen, chlorine, and sodium eliminate b.chlorine, iodine,
What prompted the collapse of the Soviet Union?