koki4 koki4
  • 21-09-2016
  • Biology
contestada

two wastes found in concrete

Respuesta :

alter2017
alter2017 alter2017
  • 21-09-2016
Greenhouse gases while the concrete is being produced and construction waste that is included in the cement.
Answer Link

Otras preguntas

the total length of 4 blue banners and 5 yellow banners is 49 meters. the total length of 2 blue banners and 1 yellow banner is 17 meters all banners of the sa
what does it mean when someone is said to ''rust out''?
how do you round 9.92,3.99,2.14,8.39,2.79,8.48,2.96,5.34,and 4.52 to the nearest tenth.
Element X is found in two forms: 90.0% is an isotope that has a mass of 20.0, and 10.0% is an isotope that has a mass of 22.0. What is the atomic mass of elemen
inez waters her plants every two days she trim them every 15 days she did both today when will she do both again
please help me write an algebraic expression equation.   then solve these percent problems.A $150 leather jacket is going on sale for a 25% discount. How
When i add 2 to my number and then multiply it bye 5 i get 30 what is my number
An innovative rural public health program is reducing infant mortality in a certain West African country. Pretend the program in Senegal has been reducing infa
A people-moving conveyor-belt moves a 600-newton person a distance of 100 meters through the airport. a. How much work was done? b. The same 600-newton person l
Find the area of a triangle with vertices of A(3, 3), B(5, 4), and C(0, 2).