hwiles0104 hwiles0104
  • 23-09-2020
  • Mathematics
contestada

A repair company charges $60 per hour of work.the repair company works 7 hours on a job.what is the total charge.

Respuesta :

jrspamstuff24
jrspamstuff24 jrspamstuff24
  • 23-09-2020

Answer: $420

Step-by-step explanation:

60 dollars x 7 hours = 420$

Answer Link

Otras preguntas

A light twig is barely floating on the surface of water. What will most likely happen to the twig if a drop of dishwashing detergent is added near it?
This is not needed for democracy to prosper
5280x5 = ?  record the product using expanded form to help
p= 144p/y how do i solve for p
Question: 5 = -(-z+3)
Which statement is false?(1 point) a. every integer is a real number b. the number zero is a rational number c. every irrational number is real number d. every
What is the solution to the rational equation x over 2x minus 1 minus 1 over 4 equals 2 over 2x minus 1? a. x=2 b. x= 7/2 c. x=3 d. x=7/6
What is the sum of r+s, when r = –14.1 and s = 18.3? a. –32.4 b. –4.2 c. 4.2 d. 32.4
Your cat's bowl hold 0.25 L. You have about 300 cm³ of milk. Will all the milk fit in the bowl?
what was a purpose of David Livingstone's travels in Africa