waylonjohnson32
waylonjohnson32 waylonjohnson32
  • 22-04-2020
  • Computers and Technology
contestada

Chris is a project manager. He would like to schedule a status meeting for the next week. Several of the group members work at another site. What should Chris do?

Respuesta :

6mrpll
6mrpll 6mrpll
  • 22-04-2020

chris should make a website so everyone can join and have a talk about the meeting

Answer Link

Otras preguntas

An art teacher recorded whether the students in three of her classes prefer water color or oil painting. She plans to create a two-way table to analyze her resu
the nurse has provided teaching to a patient who has diverticular disease but is not expericing an acute episode at this time. which statement by the patient re
A parallel-plate capacitor is charged by a battery and then the battery is removed and a dielectric of constant K is used to fill the gap between the plates. In
Ashok and Brian are both walking east along the same path; Ashok walks at a faster constant speed than does Brian. If Brian starts 30 miles east of Ashok and bo
Which of the following could be considered barriers to entry that would prevent potential competitors from entering a monopoly market? Select the two correct a
How is an ammeter connected to a circuit?
Help me please. Refer to the image first. ​
Suppose that Prince Puckler's Ice Cream sells 100 cones each day. It sells each cone for $3, its average variable cost is $2.50, marginal cost is $3, and the av
Front wheel drive vehicles typically use​
The inequality x > y is satisfied by point (5,5). true false