SirBreadCrumbs8322 SirBreadCrumbs8322
  • 25-09-2019
  • English
contestada

The Control Schedule process to ______________ completion of project work in a timely manner.

Respuesta :

ununseptiumaorta
ununseptiumaorta ununseptiumaorta
  • 03-10-2019

Answer:

The Control Schedule process to ensure completion of project work in a timely manner.

Explanation:

In managing the Project Schedule, the finalized and approved schedule represents the implemented basis for the development and direction of the schedule. On the other hand, in the time the project activities take place, most of the effort will also take place in this process to guarantee the fulfillment of the project on time.  

Answer Link

Otras preguntas

The sum of two numbers is 68 . The larger number is 16 more than the smaller number. What are the numbers?
in which part of photosynthesis is oxygen produced
The height of Gateway Arch shown on Missouri quarter is 630 feet or 7,560 inches.Find how many 4-inch stacks of quarters make up the height of Gateway Arch.If t
who conqured the aztec and how did they do it
Accented notes that run against the regular pulse of the musical meter are referred to as
in the 1760's, americans in the original 13 british colonies began to protest against
explain 2 ways to evaluate 15(90-3)
tomas bought a bottle of shampoo that held 10.5 fluid ounces. he uses 1/16 of the shampoo every time he washes his hair. how many ounces of the shampoo are left
how are proteins used in mating by Japanese beetles?
find the slope if it exists, of the line containing the pair (3,4) and (3,-7)