in an agile team, who is responsible for tracking the tasks​

Respuesta :

kmbryg kmbryg
  • 23-09-2019

Answer:

Project Manager

Explanation:

PM is overall responsible for delivering the project. He is doing this by coordinating day-to-day activities and tasks. He can delegate various tasks to responsible team members, but that means that he also needs to track the progress.

Answer Link

Otras preguntas

What is the measure of a base angle of an isosceles triangle if the measure of the vertex angle is 42 and the two congruent sides each measure 21 units?
Why did the chinese build the great wall turks?
3/8 simplified⁉️ 14/21 simplified⁉️ 9/15 simplified ⁉️
A train leaves a station at 10:40 a.m. and arrives at its destination at 1:20 p.m. Find the distance between the stations if the average speed of the train was
Keith has $500 in a savings account at the beginning of the summer. he wants to have at least $200 at the end of summer z he withdraws 25 per week for food clo
Besides earth, astronomers believe they are most likely to find evidence of life on the planet ___
In the nineteenth century, euclidean geometry was finally disproved when the fifth postulate was more closely examined.a. trueb. false
Which best describes interest groups in the early to mid 1800s
After world war ii ,the us planned to stop the spread of communism with the _____
A one compartment vertical file is to be constructed by bending the long side of an 8 in 8 in. by 10 10 in. sheet of plastic along two lines to form a U shape.