cricri9035 cricri9035
  • 25-02-2024
  • Mathematics
contestada

M can do a piece of work in 20 days. He works at it alone for 5 days and N alone finishes the remaining work in 9 days. In how many days, both of them together can complete the work ?
1. 12.5 days
2. 8 days
3. 10 days
4. 7.5 days

Respuesta :

Otras preguntas

during the day, when the sun is shining, the ground gets warm mainly as a result of 1. the emission of greenhouse gasses from factories and vehicles 2.heat from
Identify the solution(s) of the system of equations, if any. -2x - 2y = 4 8y = -8x - 16
how many moles are represented by 250g of platinum?
(c-30)(c-120)=184 how do I solve it
This reproductive structure can be considered an advancement over spores. It protects the embryo from injury and drying out. It also provides food for the embry
What are some facts about an acient China invention called viska
Cecilia is making shorts with 8 belt loop. To make the loops, she needs 8 strips of fabric. Each strip measures 1 1/4 inches wide and 7 inches long. What is the
Why did bacons rebellion collapse
x • x = 2x need help
Probably the main reason Africans, rather than Native Americans, became slaves in America was that? A. Indians passed North American diseases to the Europeans.