Gracebrown9372 Gracebrown9372
  • 21-12-2022
  • Business
contestada

a job was budgeted to require 7 hours of labor per unit at $9.00 per hour. the job consisted of 8,900 units and was completed in 61,300 hours at a total labor cost of $563,500. what is the direct labor rate variance?

Respuesta :

Otras preguntas

Jess has quit smoking, and she's trying very hard not to even think about cigarettes or how much she wants one. However, she feels like this plan has backfired
21.7 ML of gas at 98.8 K PA is allowed to expand at constant temperature in to a 52.7 mL container
The point (3,2) reflected in the x-axis is
NEED HELP URGENTLY!!1 A homeowner wants to build a deck that exhibits at least three lines of symmetry. Which of the following could NOT be the shape of the de
How much more of a day does a tiger sleep than an elephant and sloth combined? Tiger 2/3 Elephant 1/6 Sloth 5/12
which claim best supported by the data a b c or d
How do you think water and carbon dioxide used for photosynthesis get into the plant's leaf?
If a firm has demographic and purchasing information about its customers, the firm can use data mining techniques to create marketing mixes based on consumer se
c/2.1 + 1/5 = 1/4find c​
What’s the total value of the 6 in 26,312